Accession number(s): F1992:05
Previously described as AAAA1022
Published
Title based on contents of item.
Includes:
F1992:05/041.01 - uncut original negative
F1992:05/041.02 - uncut original negative
F1992:05/041.03 - uncut original negative
F1992:05/041.04 - uncut original negative
F1992:05/041.06 - synched workprint, roll 1
F1992:05/041.07 - synched sound, roll 1 [continued]
F1992:05/041.08 - synched workprint, roll 1 [continued]
F1992:05/041.10 - synched workprint, roll 2
F1992:05/041.12 - synched workprint, roll 1
F1992:05/041.14 - synched workprint, roll 2
F1992:05/041.15 - original reversal (ECO)
F1992:05/041.16 - workprint
F1992:05/041.17 - workprint
F1992:05/041.19 - dub of synched sound, roll 2
F1992:05/041.20 - dub of synched sound, roll 1
F1992:05/041.21 - dub of synched sound, roll 2
F1992:05/041.18 - dub of synched sound, roll 1
The item consists of 17 rolls of unedited film footage. The footage mainly comprises coverage of public meetings held at Madeira Park, B.C., sometime between 1978 and 1980, to discuss the social, economic and environmental impact of the then-proposed Cheekye-Dunsmuir transmission project on the Sunshine Coast. The transmission line, built in 1982-84, was created to supply electrical power to Vancouver Island by linking Cheekye substation near Squamish to Dunsmuir substation near Qualicum, using overhead transmission lines and submarine cables.
No film was completed on this subject. Items F1992:05/041.01-14 comprise the Madeira Park public meeting footage; the synched workprint and sound rolls (F1992:05/041.06-14) seem to correspond to the uncut negative rolls (F1992:05/041.01-04). Most of these items lack date notations, but the presence of two "roll ones" and two "roll twos" could indicate two separate meetings -- OR the same meeting covered by two cameras. Further research is required. The final three items are identified only as Cheekeye-Dunsmuir material.
* DDUFFY 2013-06-24
Revised Khughes 2020-03-31
Copyright British Columbia Hydro and Power Authority.