Showing 19435 results

Archival description
Engineering Office plans and technical drawings
Print preview View:

"A" Frame for Raising Roll Grinder

"A" Frame for Raising Roll Grinder

"A" Frames & Brackets for Townsite Steam Lines

"A" Frames & Brackets for Townsite Steam Lines

"A" frame unloading rig. Logging dept.

"A" frame unloading rig. Logging dept.

"B" Road Services Plan Profile

"B" Road Services Plan Profile

"Dooley" Pipe System on Sulphite on Digesters

"Dooley" Pipe System on Sulphite on Digesters

"Farrel Two Wheel Roll Grinder " Inertia Block Reinf.

"Farrel Two Wheel Roll Grinder " Inertia Block Reinf.

"Island Titan" Derrick Operator's Cabin

"Island Titan" Derrick Operator's Cabin

"Ocean Falls" Pallet Board 34" x 68"

"Ocean Falls" Pallet Board 34" x 68"

# 2 P.M. Broughton System - Separator

# 2 P.M. Broughton System - Separator

# 4 & 5 Boilers Furnace Front Wall Rebuild

# 4 & 5 Boilers Furnace Front Wall Rebuild

#1 & #2 Dye Pumps D238 & D239

#1 & #2 Dye Pumps D238 & D239

#1 & #2 P.M. Blow Roll Lifting Arm Assembly Details

#1 & #2 P.M. Blow Roll Lifting Arm Assembly Details

#1 & #2 P.M. Condensate System Tie-In

#1 & #2 P.M. Condensate System Tie-In

#1 & #2 P.M. Equipment Layout

#1 & #2 P.M. Equipment Layout

#1 & #2 P.M. Lifting Cylinder Inst. Det'l

#1 & #2 P.M. Lifting Cylinder Inst. Det'l

#1 & #2 P.M. Sec. Cleaners Sand-Bypump Piping Isometric

#1 & #2 P.M. Sec. Cleaners Sand-Bypump Piping Isometric

#1 & #2 P.M. Secondary Cleaners Sand-Bypump (Ocean Falls)

#1 & #2 P.M. Secondary Cleaners Sand-Bypump (Ocean Falls)

#1 & #2 P.M. Stock Preparation and W.W. System Flow Diagram

#1 & #2 P.M. Stock Preparation and W.W. System Flow Diagram

#1 & #2 Paper Machine Blow Roll Drive Modifications

#1 & #2 Paper Machine Blow Roll Drive Modifications

#1 & #2 Paper Machine Turbine. Field Wiring and Alarms.

#1 & #2 Paper Machine Turbine. Field Wiring and Alarms.

#1 & 2 P.M. Couch Roll Shell

#1 & 2 P.M. Couch Roll Shell

#1 & 2 P.M. Couch Roll Shell as Ordered from Beloit August 1977

#1 & 2 P.M. Couch Roll Shell as Ordered from Beloit August 1977

#1 & 2 P.M. Economizer Unit Heating Layout

#1 & 2 P.M. Economizer Unit Heating Layout

#1 & 2 P.M. Flange Connection for Suction Hose

#1 & 2 P.M. Flange Connection for Suction Hose

#1 & 2 P.M. Roll Locations W/ Co Reactions

#1 & 2 P.M. Roll Locations W/ Co Reactions

#1 & 2 P.M. Suction Couch Shell & Ring Assembly.

#1 & 2 P.M. Suction Couch Shell & Ring Assembly.

#1 & 2 P.M. Trip Indicating System for Turbines

#1 & 2 P.M. Trip Indicating System for Turbines

#1 & 2 P.M. Winders Draw Table for Automatic Tension Control

#1 & 2 P.M. Winders Draw Table for Automatic Tension Control

#1 & 2 P.M. Winders Support for Automatic Paper Tensioner Control

#1 & 2 P.M. Winders Support for Automatic Paper Tensioner Control

#1 & 2 P.M.'s Economiser Units Trafford Tile

#1 & 2 P.M.'s Economiser Units Trafford Tile
Results 1 to 30 of 19435