Energy projects review case files

  • GR-3852
  • Series
  • 1981-2006

This series contains records relating to assessing the environmental, economic, social, cultural, heritage and health impacts of energy projects under the Environmental Assessment Act. These records were created and kept by the Environment Assessment Office (EAO) that is involved in the entire process, providing advice and recommendations to the proponent.

The records in this series cover initial enquiries, reviewable and non-reviewable project enquiries. A non-reviewable project means that the proposed project may proceed without an environmental review. A project is determined to be non-reviewable if it does not meet or exceed the thresholds defined in the Reviewable Projects Regulation (B.C. Reg. 370/2002). Also, according to the Act (s. 10(1)(b)), a project which meets or exceeds these thresholds may also be deemed non-reviewable at the executive director’s discretion. Non-reviewable projects may also become reviewable if the proponent voluntarily asks for an environmental assessment (i.e., “opts in”) and the executive director agrees (s. 7) or if the minister deems the project to be reviewable.

All other projects which meet or exceed the thresholds are reviewable. For reviewable projects, terms of reference are created by the proponent, in consultation with the review agencies, in order to ensure that the application will contain the necessary information. Reports and studies are typically created by the proponent in order to fulfil the requirements of the Terms of Reference, but they may also be created by any other involved party at any stage in the review process. The application for an Environmental Assessment Certificate (EAC) is then submitted by the proponent and once the application meets the EAO’s standards, the formal review process begins. Application review includes: review by government agencies, First Nations, and the public; First Nation and public consultation; a formal public comment period; and opportunities for the proponent to respond to issues raised.

After the application review is complete, EAO staff prepare an Assessment Report for the minister, which documents the findings of the environmental assessment, including the issues raised in relation to the project and how these issues have been or could be addressed. The environmental assessment process concludes when a) The minister approves the EAC and the project proceeds, b) The minister rejects the project, c) The minister decides that no assessment is required, or d) The proponent withdraws the project. An EAC (previously known as a Project Approval Certificate [PAC]) may contain conditions to ensure that necessary mitigative and compensatory measures are in place to prevent or reduce any adverse effects of the project.

The records in this series document the business case for proposed projects, provide initial information to determine if projects meet the reviewable threshold or not, and documents the EAO ruling on whether or not the project is reviewable. Types of records that can be found in this series are certificates of public convenience and necessity, lists of options, applications for project approval certificates, memorandum, letters of intent for cooperation agreements (such as between a First Nations group and the proponent), correspondence, information notes, executive summaries of decisions, project descriptions, lists of environmental concerns (issue summaries), minutes of information presentation meetings, maps of proposed sites and a diverse range of reports and studies. Types of projects that appear in this series include natural gas pipelines, wind turbines, substation redevelopments, electric transmission systems, coal powered plants, hydroelectricity dams and others.

The records from accession 95-4252 and 95-5291 are classified under the Environmental Assessment Operational Records Classification System (Schedule 132564) and cover the following primary number:
30050: reviewable enquiries and projects – energy
And the following secondary numbers:
-05: non-reviewable energy project enquiries
-40: pre-application reviewable enquiry case files