Aeroplane view of the south slocan plant on the Kootenay River.
"Air cooler and washer building, no. 3 plant, W.K.P. and L. Company", no. 24; print title.
BC Hydro's Ruskin development; crane and aggregate processing plant.
BC Hydro's Ruskin development; crane and aggregate processing plant; photograph no. R.P. 180.
"Coffer dam and canyon, Nanaimo Dam, 15th Oct 1931", No. 22.
"Commencing easterly or second section of the dam across the Okanagan River at MacIntryre's Bluff, Oliver project".
"Completed Nanaimo Dam as of 24th Oct 1931", No. 75.
"Dam on the Puntledge River, Canadian Collieries (Dunsmuirs) Limited".
"Damsite on Stave River at Ruskin".
"Diversion dam, Barriere plant, City of Kamloops".
"Downstream face of Blind Slough Dam at Stave Lake, Western Power Company of Canada".
"East Kootenay Power Co. diversion dam on the Bull River".
"East Kootenay Power Co., diversion dam on the Bull River".
"East portal of Nanaimo tunnel immediately after first shot in tunnel at 9:30 am", No. 2.
"East portal of tunnel prior to firing first shot in tunnel at 9:30 am, Nanaimo Dam", No. 1.
"Eastwood multiple arch dam at Anyox, Granby Consolidated Mining and Smelting Co. Ltd.".
"Eastwood multiple arch dam under construction, Granby Consolidated Mining and Smelting Co. at Anyox".
"Electric plant at Stave Falls; Western Power Company of Canada".
Elevated view of Ruskin dam and power plant construction; photographer no. R.P. 302.
"Flood control station at south end of Okanagan Lake, 650 c.f.s. discharge 11 Jun 1922".
"Flume alongside river during Nanaimo Dam construction, 1st May 1931", No. 41.
"From west end of canyon, Nanaimo Dam construction, 19 Aug 1930", No 12.
"General view from above dam, looking south", 1-sluice dam; 2-intake site; 3-powerhouse site; 4-flume to provisional power plant; 5-construction camp; Stave Falls power project.
"Headwaters, no. 3 plant W.K.P. and L. Company", no. 2; print title.
Hester Creek spillway discharge, Oliver project.
"Hydraulic fill dam, Coquitlam Lake, Vancouver Power Company".