- MS-1172.3
- File
- Sep 1958
Part of F. James Pine fonds
British Thomson-Houston Co. (Canada) Ltd. Report on Rocky Mountain Trench Area, Hydro-Electric Investigations, Stage 1, Prepared by BC Engineering Co. Ltd., revised to September 1958. Volume 1: Summary and Introduction: the Projects; Volume 2: Peace River Basin Power Sites.