Print preview Close

Showing 2821 results

Archival description
Peace River (B.C.)
Print preview View:

2108 results with digital objects Show results with digital objects

Site One project in the canyon of the Peace : its effects on the environment, people and power

The item is a print of an industrial film from 1974. It examines the proposed development of the Site One power project on the Peace River, 14 miles downstream from the W.A.C. Bennett Dam. The film profiles the growing energy demand which necessitates the project, and examines the engineering details, environmental effects, social impact, and land use and recreational considerations of the plan.

Hydro in action

The item is a print of a promotional film from 1974, apparently produced for continuous screenings in a B.C. Hydro display at the Pacific National Exhibition. It contains an overview of BC Hydro efforts to meet the growing demand for electrical power. Includes footage of: construction at the Peace River project and Mica dam powerhouse; public beaches on Arrow reservoir; ecological projects such as Creston wildfowl sanctuary and Meadow Creek spawning channel; overland and undersea transmission lines; Kootenay Canal dam site and Burrard Thermal station. Much of the same footage appears in "Power and People".

Prophecy of the Peace : [short version]

The item is a release print of an industrial film, made in 1964-1965. It show the continuing construction of Portage Mountain dam on the Peace River. Includes: re-enactments of the region's history (Indigenous people, Alexander Mackenzie's journeys, fur trade & homesteading); local farming; dam construction; the 5-mile conveyor built to carry earth fill to build the dam; activities in and around Prince George; the Endako Mine; etc.

Operation update : energy blueprint for the eighties : [long version]

The item is a release print of an industrial film from 1981. In it, B.C. Hydro president J. Norman Olsen introduces a look at Hydro's strategies for meeting B.C.'s energy needs in the 1980s. The film considers the limited options for future hydro-electric development, low-water problems, load growth projections, and the promotion of energy conservation and more careful energy use during winter peak hours. Several forthcoming or proposed B.C. Hydro projects are discussed, including the Cheekye-Dunsmuir submarine power cable; the Site C development on the Peace River; the Hat Creek coal project; proposals for hydro-electric developments on the Stikine, Iskut and Liard Rivers; high-voltage transmission experiments, inert-gas switching systems, and other R&D projects; the Meager Creek geothermal project; and studies for a natural gas pipeline to Vancouver Island. Also discussed: Hydro rail operations; financing of Hydro projects; Hydro's growing demand for skilled personnel in specific fields and trades. The discussion of specific projects is illustrated with footage of the project or its physical setting, and there is especially good footage of the Stikine, Iskut and Liard River areas.

Committee records relating to the Peace River and Mackenzie River basins

  • GR-1149
  • Series
  • 1972-1975

The series contains records relating to the Peace River and Mackenzie River basins, from correspondence file 0309728. It consists of a preliminary report on the Peace River basin flood of 1972 by the Inland Waters Branch of Environment Canada and records of meetings of the Mackenzie Basin Intergovernmental Liaison Committee.

British Columbia. Dept. of Lands, Forests and Water Resources

Results 1 to 30 of 2821